Brownfield land

3074x

Geographical area

About this entity

Fact links
CURIE brownfield-land:3074x no fact link
Prefix brownfield-land Facts about Prefix
Reference 3074x Facts about Reference
Name 3074x Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Brownfield land no fact link
Organisation Northumberland County Council no fact link
Start date 2017-12-17 Facts about Start date
End date Facts about End date
Entry date 2025-12-16 Facts about Entry date
Typology geography no fact link
Point POINT (-1.689111 55.179019) Facts about Point
Notes This is the second phase of the strategic redevelopment of St. George's Hospital site. The site is made up of a range of buildings and a large area of associated land. The facility became vacant, surplus to requirements, and available for redevelopment after closure of the facility, following the completion of the new St. George's Hospital facility on adjacent land. Demolition of the remaining 12 buildings was initially undertaken (15/01620/DEMGDO), before a hybrid permission was secured for 875 homes, alongside a wide range of supporting uses, in 2018 (16/00994/FULES). As well as residential development, the scheme includes a local centre to potentially provide a range of retail, food and drink, community, leisure and businesses uses, alongside associated open space and strategic infrastructure. The hybrid consent includes full permission for construction of a link road and junction to connect to the Morpeth 'Northern Bypass', and then outline permission for the bulk of the future development, including the residential aspect. This part of the scheme comprises of 875 new homes, providing a whole range of properties, for a mix of sizes, styles and tenures. Site is a mix of brownfield and greenfield land with the former involving redevelopment of existing buildings. Brownfield element (c.20ha) represents around one-third of the site area - a yield of around 282 dwellings can be calculated based on methodological approach. For indicative purposes in the BF Register, the original SHLAA site (ref 3074) is split to reflect brownfield and greenfield elements - total area of 64.51ha. The first detailed application for phase-1 of the residential development for this part of the site was permitted in November 2024 (24/03570/REM). This follows reserved matters and detailed permissions for site-wide infrastructure and access (permitted August 2022). First completions are forecast within the coming twelve months, with a long-term build-out programme to follow. As such, the site is deliverable but completions are anticipated to continue into the longer-term (11 to 15 years). NB - see separate record for Phase-1 of the wider St. George's scheme (3397). Facts about Notes
Hectares 20.8 Facts about Hectares
Deliverable yes Facts about Deliverable
Site address St George's Hospital (land north), Morpeth (brownfield parcel) Facts about Site address
Site plan url https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/ Facts about Site plan url
Ownership status owned-by-a-public-authority Facts about Ownership status
Maximum net dwellings 282 Facts about Maximum net dwellings
Minimum net dwellings 282 Facts about Minimum net dwellings
Planning permission date 2018-05-04 Facts about Planning permission date
Planning permission type full-planning-permission Facts about Planning permission type
Planning permission status permissioned Facts about Planning permission status
Planning permission history https://publicaccess.northumberland.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=NOP3EVQS0GA00 Facts about Planning permission history

Available Code Snippets:

{
        "entry-date": "2025-12-16",
        "start-date": "2017-12-17",
        "end-date": "",
        "entity": 1716227,
        "name": "3074x",
        "dataset": "brownfield-land",
        "typology": "geography",
        "reference": "3074x",
        "prefix": "brownfield-land",
        "organisation-entity": 220,
        "geometry": "",
        "point": "POINT (-1.689111 55.179019)",
        "quality": "authoritative",
        "notes": "This is the second phase of the strategic redevelopment of St. George's Hospital site. The site is made up of a range of buildings and a large area of associated land. The facility became vacant, surplus to requirements, and available for redevelopment after closure of the facility, following the completion of the new St. George's Hospital facility on adjacent land. Demolition of the remaining 12 buildings was initially undertaken (15/01620/DEMGDO), before a hybrid permission was secured for 875 homes, alongside a wide range of supporting uses, in 2018 (16/00994/FULES). As well as residential development, the scheme includes a local centre to potentially provide a range of retail, food and drink, community, leisure and businesses uses, alongside associated open space and strategic infrastructure. The hybrid consent includes full permission for construction of a link road and junction to connect to the Morpeth 'Northern Bypass', and then outline permission for the bulk of the future development, including the residential aspect. This part of the scheme comprises of 875 new homes, providing a whole range of properties, for a mix of sizes, styles and tenures. Site is a mix of brownfield and greenfield land with the former involving redevelopment of existing buildings. Brownfield element (c.20ha) represents around one-third of the site area - a yield of around 282 dwellings can be calculated based on methodological approach. For indicative purposes in the BF Register, the original SHLAA site (ref 3074) is split to reflect brownfield and greenfield elements - total area of 64.51ha. The first detailed application for phase-1 of the residential development for this part of the site was permitted in November 2024 (24/03570/REM). This follows reserved matters and detailed permissions for site-wide infrastructure and access (permitted August 2022). First completions are forecast within the coming twelve months, with a long-term build-out programme to follow. As such, the site is deliverable but completions are anticipated to continue into the longer-term (11 to 15 years). NB - see separate record for Phase-1 of the wider St. George's scheme (3397).",
        "hectares": "20.8",
        "deliverable": "yes",
        "site-address": "St George's Hospital (land north), Morpeth (brownfield parcel)",
        "site-plan-url": "https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/",
        "ownership-status": "owned-by-a-public-authority",
        "maximum-net-dwellings": "282",
        "minimum-net-dwellings": "282",
        "planning-permission-date": "2018-05-04",
        "planning-permission-type": "full-planning-permission",
        "planning-permission-status": "permissioned",
        "planning-permission-history": "https://publicaccess.northumberland.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=NOP3EVQS0GA00"
    }
Loading...

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.