Brownfield land
17140201
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:17140201 | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | 17140201 | Facts about Reference |
| Name | 17140201 | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | London Borough of Haringey | no fact link |
| Start date | 2017-12-31 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2021-02-02 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-0.054545 51.588789)
|
Facts about Point |
| Notes | Outline planning permission (for the entire site) for a residential led mixed use development comprising the demolition of existing buildings and structures; the construction of buildings across the site to include residential (up to 505 units) and flexible retail or business uses (Use Classes A1-A5 or B1); pedestrian/cycle footbridges, modification works to the existing vehicular access and associated highway works; refurbishment of existing infrastructure (including provision of an on-site energy centre, if required), landscaping and public realm works; new servicing arrangements; car/cycle parking; and associated and facilitating works. All matters are reserved for the pedestrian footbridges, Phases 2 and 3 Buildings and detailed permission is sought with no matters reserved for the Phase 1 Buildings. The detailed component of the application (Phase 1 buildings only) comprises the demolition of existing buildings; the construction of buildings ranging from 16 to 21 storeys to accommodate 249 residential units and 307m2 (GIA) of flexible retail or business uses (Use Classes A1-A5 or B1); modification works to the existing vehicular access and associated highway works; infrastructure (including provision of an on-site energy centre, if required), landscaping and public realm works; new servicing arrangements; car/cycle parking; and associated and facilitating works.. http://www.planningservices.haringey.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=290435 | Facts about Notes |
| Hectares | 6.32 | Facts about Hectares |
| Deliverable | yes | Facts about Deliverable |
| Site address | Hale Wharf | Facts about Site address |
| Site plan url | http://www.planningservices.haringey.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=290435 | Facts about Site plan url |
| Ownership status | mixed-ownership | Facts about Ownership status |
| Planning permission date | 2017-06-13 | Facts about Planning permission date |
| Planning permission type | outline-planning-permission | Facts about Planning permission type |
| Planning permission status | permissioned | Facts about Planning permission status |
Available Code Snippets:
{
"entry-date": "2021-02-02",
"start-date": "2017-12-31",
"end-date": "",
"entity": 1710229,
"name": "17140201",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "17140201",
"prefix": "brownfield-land",
"organisation-entity": 175,
"geometry": "",
"point": "POINT (-0.054545 51.588789)",
"quality": "authoritative",
"notes": "Outline planning permission (for the entire site) for a residential led mixed use development comprising the demolition of existing buildings and structures; the construction of buildings across the site to include residential (up to 505 units) and flexible retail or business uses (Use Classes A1-A5 or B1); pedestrian/cycle footbridges, modification works to the existing vehicular access and associated highway works; refurbishment of existing infrastructure (including provision of an on-site energy centre, if required), landscaping and public realm works; new servicing arrangements; car/cycle parking; and associated and facilitating works. All matters are reserved for the pedestrian footbridges, Phases 2 and 3 Buildings and detailed permission is sought with no matters reserved for the Phase 1 Buildings. The detailed component of the application (Phase 1 buildings only) comprises the demolition of existing buildings; the construction of buildings ranging from 16 to 21 storeys to accommodate 249 residential units and 307m2 (GIA) of flexible retail or business uses (Use Classes A1-A5 or B1); modification works to the existing vehicular access and associated highway works; infrastructure (including provision of an on-site energy centre, if required), landscaping and public realm works; new servicing arrangements; car/cycle parking; and associated and facilitating works.. http://www.planningservices.haringey.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=290435",
"hectares": "6.32",
"deliverable": "yes",
"site-address": "Hale Wharf",
"site-plan-url": "http://www.planningservices.haringey.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=290435",
"ownership-status": "mixed-ownership",
"planning-permission-date": "2017-06-13",
"planning-permission-type": "outline-planning-permission",
"planning-permission-status": "permissioned"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.