Brownfield land

SHLAACAN026

Field Value Fact links
Reference SHLAACAN026 Facts
Prefix brownfield-land Facts
Name SHLAACAN026 Facts
Dataset Brownfield land no fact link
Organisation Woking Borough Council no fact link
Start date 2017-12-20 no fact link
End date no fact link
Entry date 2017-12-20 Facts
Typology geography no fact link
Dataset name Facts
Notes Reference PLAN/2015/1260 (current permission).. Hybrid planning application (part outline, part full planning application): for the demolition of 576 residential units, existing non-residential buildings and sports facilities and redevelopment of the site to be implemented in phases with the associated engineering works to provide a mixed-use development comprising: up to 922 residential units (Class C3), 62 units (Class C2), up to 1,110sqm community/youth centre and up to 600sqm nursery/children's centre (Class D1), up to 5,478sqm Leisure Centre (Class D2), 1,650sqm retail (flexible use within Class A1 and/or A2 and/or A3 and/or A4 and/or A5), up to 416sqm health centre (Class D1), an artificial grass pitch (AGP), with spectator seating, erection of sports amenity lighting, improvements to Bishop David Brown School playing fields, a new substation, formation of car park including bus/coach drop-off area, hard and soft landscaping and open space with a multi-use games area (MUGAs) and a skate park, reconfigured and new vehicular and pedestrian accesses and works to the public highway and associated works; including full planning application for detailed first phase comprising: demolition of 5 residential units, 903sqm of ancillary buildings at Bishop David Brown School and existing athletics track and construction of 92 residential units (11no. 2-bed units, 39no. 3-bed units, 39no. 4-bed units and 3no. 5-bed units), 5,478sqm Leisure Centre (Class D2), an artificial grass pitch (AGP) with spectator seating, erection of sports amenity lighting, improvements to Bishop David Brown School playing fields, a new substation, formation of car park including bus/coach drop off area, with hard and soft landscaping and open space, reconfigured and new vehicular and pedestrian access and works to the public highway. (AMENDED DESCRIPTION AND AMENDED/ADDITIONAL INFORMATION RECEIVED 07.12.15, 10.12.15, 25.02.16, 03.03.16, 04.03.16, 29.03.16 AND 06.05.16) Facts
Hectares 33 Facts
Deliverable yes Facts
Site address Land within Sheerwater Priority Place, Albert Drive, Woking GU21 5RE Facts
Site plan url http://www.woking2027.info/ldfregisters Facts
Ownership status mixed-ownership Facts
Maximum net dwellings 250 Facts
Planning permission date 2016-07-27 Facts
Planning permission type full-planning-permission Facts
Planning permission status permissioned Facts
Planning permission history https://www.woking.gov.uk/planning/publicaccess Facts

Available Code Snippets:

{
    "reference": "SHLAACAN026",
    "prefix": "brownfield-land",
    "name": "SHLAACAN026",
    "dataset": "brownfield-land",
    "organisation-entity": "379",
    "start-date": "2017-12-20",
    "end-date": "",
    "entry-date": "2017-12-20",
    "typology": "geography",
    "geometry": "",
    "point": "",
    "entity": 1705927,
    "dataset-name": "",
    "notes": "Reference PLAN/2015/1260 (current permission).. Hybrid planning application (part outline, part full planning application): for the demolition of 576 residential units, existing non-residential buildings and sports facilities and redevelopment of the site to be implemented in phases with the associated engineering works to provide a mixed-use development comprising: up to 922 residential units (Class C3), 62 units (Class C2), up to 1,110sqm community/youth centre and up to 600sqm nursery/children's centre (Class D1), up to 5,478sqm Leisure Centre (Class D2), 1,650sqm retail (flexible use within Class A1 and/or A2 and/or A3 and/or A4 and/or A5), up to 416sqm health centre (Class D1), an artificial grass pitch (AGP), with spectator seating, erection of sports amenity lighting, improvements to Bishop David Brown School playing fields, a new substation, formation of car park including bus/coach drop-off area, hard and soft landscaping and open space with a multi-use games area (MUGAs) and a skate park, reconfigured and new vehicular and pedestrian accesses and works to the public highway and associated works; including full planning application for detailed first phase comprising: demolition of 5 residential units, 903sqm of ancillary buildings at Bishop David Brown School and existing athletics track and construction of 92 residential units (11no. 2-bed units, 39no. 3-bed units, 39no. 4-bed units and 3no. 5-bed units), 5,478sqm Leisure Centre (Class D2), an artificial grass pitch (AGP) with spectator seating, erection of sports amenity lighting, improvements to Bishop David Brown School playing fields, a new substation, formation of car park including bus/coach drop off area, with hard and soft landscaping and open space, reconfigured and new vehicular and pedestrian access and works to the public highway. (AMENDED DESCRIPTION AND AMENDED/ADDITIONAL INFORMATION RECEIVED 07.12.15, 10.12.15, 25.02.16, 03.03.16, 04.03.16, 29.03.16 AND 06.05.16)",
    "hectares": "33",
    "deliverable": "yes",
    "site-address": "Land within Sheerwater Priority Place, Albert Drive, Woking GU21 5RE",
    "site-plan-url": "http://www.woking2027.info/ldfregisters",
    "ownership-status": "mixed-ownership",
    "maximum-net-dwellings": "250",
    "planning-permission-date": "2016-07-27",
    "planning-permission-type": "full-planning-permission",
    "planning-permission-status": "permissioned",
    "planning-permission-history": "https://www.woking.gov.uk/planning/publicaccess"
}
Loading...

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.

Geographical area


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.