Brownfield land
24
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:24 | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | 24 | Facts about Reference |
| Name | 24 | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | Forest of Dean District Council | no fact link |
| Start date | 2017-10-31 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2020-02-05 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-2.51398 51.710272)
|
Facts about Point |
| Notes | part of large mixed allocation, which can include an element of housing as part of the mix. Likely to support up to 30 units but this is neither a fixed requirement nor an absolute limit. Currently vacant but subject to planning application, awaiting decision. Application is in conformity with the allocation for mixed uses and includes residential accommodation tied to the proposed employment on the site. | Facts about Notes |
| Hectares | 4.82 | Facts about Hectares |
| Deliverable | yes | Facts about Deliverable |
| Site address | Pine End Works Harbour Road Lydney | Facts about Site address |
| Site plan url | https://maps.fdean.gov.uk/map/Aurora.svc/run?script=%5cAurora%5cFoDDC+-+SHLAA.AuroraScript%24&nocache=1347652503&resize=always&inspect_query=Brownfield_Land_Registery&inspect_value=Aurora23&scale=2048 | Facts about Site plan url |
| Ownership status | not-owned-by-a-public-authority | Facts about Ownership status |
| Maximum net dwellings | 30 | Facts about Maximum net dwellings |
| Minimum net dwellings | 20 | Facts about Minimum net dwellings |
| Planning permission status | pending-decision | Facts about Planning permission status |
| Planning permission history | https://publicaccess.fdean.gov.uk/online-applications/applicationDetails.do?keyVal=PQTT0GHI01000&activeTab=summary | Facts about Planning permission history |
Available Code Snippets:
{
"entry-date": "2020-02-05",
"start-date": "2017-10-31",
"end-date": "",
"entity": 1704667,
"name": "24",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "24",
"prefix": "brownfield-land",
"organisation-entity": 139,
"geometry": "",
"point": "POINT (-2.51398 51.710272)",
"quality": "authoritative",
"notes": "part of large mixed allocation, which can include an element of housing as part of the mix. Likely to support up to 30 units but this is neither a fixed requirement nor an absolute limit. Currently vacant but subject to planning application, awaiting decision. Application is in conformity with the allocation for mixed uses and includes residential accommodation tied to the proposed employment on the site.",
"hectares": "4.82",
"deliverable": "yes",
"site-address": "Pine End Works Harbour Road Lydney",
"site-plan-url": "https://maps.fdean.gov.uk/map/Aurora.svc/run?script=%5cAurora%5cFoDDC+-+SHLAA.AuroraScript%24&nocache=1347652503&resize=always&inspect_query=Brownfield_Land_Registery&inspect_value=Aurora23&scale=2048",
"ownership-status": "not-owned-by-a-public-authority",
"maximum-net-dwellings": "30",
"minimum-net-dwellings": "20",
"planning-permission-status": "pending-decision",
"planning-permission-history": "https://publicaccess.fdean.gov.uk/online-applications/applicationDetails.do?keyVal=PQTT0GHI01000&activeTab=summary"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.