Permitted development right
Development by statutory undertakers
| Field | Value | Fact links |
|---|---|---|
| CURIE | permitted-development-right:XVIII(D)-1977 | no fact link |
| Prefix | permitted-development-right | Facts |
| Reference | XVIII(D)-1977 | Facts |
| Name | Development by statutory undertakers | Facts |
| Quality | Some: We have some data from an alternative source | no fact link |
| Dataset | Permitted development right | no fact link |
| Organisation | Ministry of Housing, Communities & Local Government | no fact link |
| Start date | 1977-03-29 | Facts |
| End date | Facts | |
| Entry date | 2026-06-10 | Facts |
| Typology | category | no fact link |
| Notes | None | Facts |
| Description | Gas undertakings. Development required for the purposes of the undertakings of any of the following descriptions, that is to say:- (i) the laying underground of mains, pipes, or other apparatus; (ii) the installation in a gas distribution system of apparatus for measuring, recording, controlling or varying the pressure flow or volume of gas, and structures for housing such apparatus not exceeding (except where constructed underground elsewhere than under a highway) 29 cubic metres in capacity; (iii) the construction, in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965(a) of boreholes, other than those shown in the order as approved by the Secretary of State for Energy for the purpose of subsection (6) of the said section 4, and the erection or construction, in any such area, or any plant or machinery, not exceeding 6 metres in height which is required in connection with the construction of any such borehole; (iv) the placing and storage on land of pipe and other apparatus needed for inclusion in a main or pipe which is being or is about to be laid or constructed in pursuance of a planning permission granted or deemed to be granted under Part III of the Act; (v) the erection on operational land of the undertaking, solely for the protection of plant or machinery, or structures or erections of the nature of plant or machinery, of buildings not exceeding 15 metres in height; (vi) any other development carried out in, on, over or under operational land of the undertaking except:- (a) the erection, or the reconstruction or alteration so as materially to affect the design or external appearance thereof, of buildings; (b) the installation of any plant or machinery, or structures or erections of the nature of plant or machinery, exceeding 15 metres in height, or capable, without addition, of being extended to a height exceeding 15 metres; (c) the replacement of any plant or machinery, or structures or erections of the nature of plant or machinery, to a height exceeding 15 metres or the height of the plant, machinery, structure or erection so replaced, whichever is the greater. | Facts |
| Documentation url | https://www.legislation.gov.uk/uksi/1977/289/contents/made | Facts |
| Permitted development right part | (D) | Facts |
| Permitted development right class | XVIII | Facts |
Contents
{
"entry-date": "2026-06-10",
"start-date": "1977-03-29",
"end-date": "",
"entity": 11500233,
"name": "Development by statutory undertakers",
"dataset": "permitted-development-right",
"typology": "category",
"reference": "XVIII(D)-1977",
"prefix": "permitted-development-right",
"organisation-entity": "600001",
"geometry": "",
"point": "",
"quality": "some",
"notes": "None",
"description": "Gas undertakings. Development required for the purposes of the undertakings of any of the following descriptions, that is to say:- (i) the laying underground of mains, pipes, or other apparatus; (ii) the installation in a gas distribution system of apparatus for measuring, recording, controlling or varying the pressure flow or volume of gas, and structures for housing such apparatus not exceeding (except where constructed underground elsewhere than under a highway) 29 cubic metres in capacity; (iii) the construction, in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965(a) of boreholes, other than those shown in the order as approved by the Secretary of State for Energy for the purpose of subsection (6) of the said section 4, and the erection or construction, in any such area, or any plant or machinery, not exceeding 6 metres in height which is required in connection with the construction of any such borehole; (iv) the placing and storage on land of pipe and other apparatus needed for inclusion in a main or pipe which is being or is about to be laid or constructed in pursuance of a planning permission granted or deemed to be granted under Part III of the Act; (v) the erection on operational land of the undertaking, solely for the protection of plant or machinery, or structures or erections of the nature of plant or machinery, of buildings not exceeding 15 metres in height; (vi) any other development carried out in, on, over or under operational land of the undertaking except:- (a) the erection, or the reconstruction or alteration so as materially to affect the design or external appearance thereof, of buildings; (b) the installation of any plant or machinery, or structures or erections of the nature of plant or machinery, exceeding 15 metres in height, or capable, without addition, of being extended to a height exceeding 15 metres; (c) the replacement of any plant or machinery, or structures or erections of the nature of plant or machinery, to a height exceeding 15 metres or the height of the plant, machinery, structure or erection so replaced, whichever is the greater.",
"documentation-url": "https://www.legislation.gov.uk/uksi/1977/289/contents/made",
"permitted-development-right-part": "(D)",
"permitted-development-right-class": "XVIII"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.