Permitted development right

Electronic communications code operators

Field Value Fact links
Reference 16A Facts
Prefix permitted-development-right Facts
Name Electronic communications code operators Facts
Dataset Permitted development right no fact link
Organisation Ministry of Housing, Communities & Local Government no fact link
Start date 1995-01-01 no fact link
End date no fact link
Entry date 2020-12-30 Facts
Typology category no fact link
Description Development by or on behalf of an electronic communications code operator for the purpose of the operator’s electronic communications network in, on, over or under land controlled by that operator or in accordance with the electronic communications code, consisting of: (a) the installation, (b) the use of land in an emergency for a period not exceeding 6 months to station and operate moveable electronic communications apparatus required for the replacement of unserviceable electronic communications apparatus, or (c) development ancillary to radio equipment housing. Facts
Documentation url https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/16/crossheading/class-a-electronic-communications-code-operators/made Facts
Permitted development right part 16 Facts
Permitted development right class A Facts

Contents

{
    "reference": "16A",
    "prefix": "permitted-development-right",
    "name": "Electronic communications code operators",
    "dataset": "permitted-development-right",
    "organisation-entity": "600001",
    "start-date": "1995-01-01",
    "end-date": "",
    "entry-date": "2020-12-30",
    "typology": "category",
    "geometry": "",
    "point": "",
    "entity": 11500109,
    "description": "Development by or on behalf of an electronic communications code operator for the purpose of the operator\u2019s electronic communications network in, on, over or under land controlled by that operator or in accordance with the electronic communications code, consisting of: (a) the installation, (b) the use of land in an emergency for a period not exceeding 6 months to station and operate moveable electronic communications apparatus required for the replacement of unserviceable electronic communications apparatus, or (c) development ancillary to radio equipment housing.",
    "documentation-url": "https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/16/crossheading/class-a-electronic-communications-code-operators/made",
    "permitted-development-right-part": "16",
    "permitted-development-right-class": "A"
}

© Crown copyright and database right 2024

Licensed under the Open Government Licence v.3.0.