Gas transporters
Field | Value | Fact links |
---|---|---|
Reference | 15A | Facts |
Prefix | permitted-development-right | Facts |
Name | Gas transporters | Facts |
Dataset | Permitted development right | no fact link |
Organisation | Ministry of Housing, Communities & Local Government | no fact link |
Start date | 1995-01-01 | no fact link |
End date | no fact link | |
Entry date | 2020-12-31 | Facts |
Typology | category | no fact link |
Description | Development by a gas transporter required for the purposes of its undertaking consisting of: (a) the laying underground of mains, (b) the installation in a gas distribution system of apparatus for measuring, controlling or varying the pressure, flow or volume of gas, and structures for housing such apparatus; (c) the construction in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965 (storage authorisation orders)(65), and the erection or construction in any such area of any plant or machinery required in connection with the construction of such boreholes; (d) the placing and storage on land of pipes and other apparatus to be included in a main or pipe which is being or is about to be laid or constructed in pursuance of planning permission granted or deemed to be granted under Part 3 of the Act (control over development); (e) the erection on operational land of the gas transporter of a building solely for the protection of plant or machinery; (f) any other development carried out in, over or under the operational land of the gas transporter. | Facts |
Documentation url | https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/15/crossheading/class-a-gas-transporters/made | Facts |
Permitted development right part | 15 | Facts |
Permitted development right class | A | Facts |
Contents
{
"reference": "15A",
"prefix": "permitted-development-right",
"name": "Gas transporters",
"dataset": "permitted-development-right",
"organisation-entity": "600001",
"start-date": "1995-01-01",
"end-date": "",
"entry-date": "2020-12-31",
"typology": "category",
"geometry": "",
"point": "",
"entity": 11500107,
"description": "Development by a gas transporter required for the purposes of its undertaking consisting of: (a) the laying underground of mains, (b) the installation in a gas distribution system of apparatus for measuring, controlling or varying the pressure, flow or volume of gas, and structures for housing such apparatus; (c) the construction in any storage area or protective area specified in an order made under section 4 of the Gas Act 1965 (storage authorisation orders)(65), and the erection or construction in any such area of any plant or machinery required in connection with the construction of such boreholes; (d) the placing and storage on land of pipes and other apparatus to be included in a main or pipe which is being or is about to be laid or constructed in pursuance of planning permission granted or deemed to be granted under Part 3 of the Act (control over development); (e) the erection on operational land of the gas transporter of a building solely for the protection of plant or machinery; (f) any other development carried out in, over or under the operational land of the gas transporter.",
"documentation-url": "https://www.legislation.gov.uk/uksi/2015/596/schedule/2/part/15/crossheading/class-a-gas-transporters/made",
"permitted-development-right-part": "15",
"permitted-development-right-class": "A"
}
© Crown copyright and database right 2024
Licensed under the Open Government Licence v.3.0.