Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Infrastructure project

Rivenhall IWMF and Energy Centre

Geographical area

About this entity

Fact links
CURIE infrastructure-project:EN010138 no fact link
Prefix infrastructure-project Facts about Prefix
Reference EN010138 Facts about Reference
Name Rivenhall IWMF and Energy Centre Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Infrastructure project no fact link
Organisation Planning Inspectorate no fact link
Start date 2023-11-10 Facts about Start date
End date Facts about End date
Entry date 2026-10-24 Facts about Entry date
Typology geography no fact link
Geometry MULTIPOLYGON (((0.643194 51.853284, 0.645403 51.851879, 0.646822 51.852759, 0.647147 51.852552, 0.647744 51.852938, 0.646594 51.853673, 0.646812 51.853803, 0.645493 51.854646, 0.643194 51.853284))) Facts about Geometry
Point POINT (0.645755 51.853662) Facts about Point
Description The Rivenhall Integrated Waste Management Facility (IWMF) and Energy Centre development is for extension to a generating station to enable electrical generating capacity of up to 65MW together with associated development. Facts about Description
Documentation url https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010138 Facts about Documentation url
Infrastructure project type EN01 - Generating Stations Facts about Infrastructure project type
Infrastructure project decision post-decision Facts about Infrastructure project decision

Available Code Snippets:

{
        "entry-date": "2026-10-24",
        "start-date": "2023-11-10",
        "end-date": "",
        "entity": 11100000005,
        "name": "Rivenhall IWMF and Energy Centre",
        "dataset": "infrastructure-project",
        "typology": "geography",
        "reference": "EN010138",
        "prefix": "infrastructure-project",
        "organisation-entity": 14,
        "geometry": "MULTIPOLYGON (((0.643194 51.853284, 0.645403 51.851879, 0.646822 51.852759, 0.647147 51.852552, 0.647744 51.852938, 0.646594 51.853673, 0.646812 51.853803, 0.645493 51.854646, 0.643194 51.853284)))",
        "point": "POINT (0.645755 51.853662)",
        "quality": "authoritative",
        "description": "The Rivenhall Integrated Waste Management Facility (IWMF) and Energy Centre development is for extension to a generating station to enable electrical generating capacity of up to 65MW together with associated development.",
        "documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010138",
        "infrastructure-project-type": "EN01 - Generating Stations",
        "infrastructure-project-decision": "post-decision"
    }
Loading...

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.