Planning application
2024/2183/P
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-application:2024/2183/P | no fact link |
| Prefix | planning-application | Facts |
| Reference | 2024/2183/P | Facts |
| Name | Facts | |
| Quality | We have no data | no fact link |
| Dataset | Planning application | no fact link |
| Organisation | London Borough of Camden | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-09-09 | Facts |
| Typology | geography | no fact link |
| Point |
POINT (-0.129441 51.52642)
|
Facts |
| Description | Variation of condition 2 (approved drawings) of planning permission 2023/3680/P dated 13/03/2024 for the Erection of a single storey extension, erection of an electrical substation, following the demolition of the existing substation & enclosure installation of new front entrance, removal of a goods lift and enclosure from the front of the building, all on Woburn Walk at ground floor level, replacement of the existing goods platform lift to the front elevation and amendments to the rear terrace (south) at basement level and erection of an open-sided canopy.; namely, changes external changes to the replacement gates, changes to doors and windows, revised staircase design, revised canopy design and inclusion of a security gate) and a revised platform lift. | Facts |
| Address text | County Hotel Upper Woburn Place London WC1H 0JW | Facts |
| Decision date | 2024-11-19 | Facts |
| Planning decision type | Granted | Facts |
| Planning application status | Final Decision | Facts |
Available Code Snippets:
{
"entry-date": "2025-09-09",
"start-date": "",
"end-date": "",
"entity": 10000041376,
"name": "",
"dataset": "planning-application",
"typology": "geography",
"reference": "2024/2183/P",
"prefix": "planning-application",
"organisation-entity": "90",
"geometry": "",
"point": "POINT (-0.129441 51.52642)",
"quality": "",
"description": "Variation of condition 2 (approved drawings) of planning permission 2023/3680/P dated 13/03/2024 for the Erection of a single storey extension, erection of an electrical substation, following the demolition of the existing substation & enclosure installation of new front entrance, removal of a goods lift and enclosure from the front of the building, all on Woburn Walk at ground floor level, replacement of the existing goods platform lift to the front elevation and amendments to the rear terrace (south) at basement level and erection of an open-sided canopy.; namely, changes external changes to the replacement gates, changes to doors and windows, revised staircase design, revised canopy design and inclusion of a security gate) and a revised platform lift.",
"address-text": "County Hotel Upper Woburn Place London WC1H 0JW",
"decision-date": "2024-11-19",
"planning-decision-type": "Granted",
"planning-application-status": "Final Decision"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Geographical area
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.