[{"fact":"f8d28626a6a22b79d1e620122ff27c41da8cb45d780ba690e83bc41ac70ad1cb","entity":73002842,"reference-entity":"","field":"description","value":"Bins from plots 1-6 should be placed alongside those from plot 45 for collection in one location, sufficient space should be allocated for a bin collection point The bin collection point should provide suitable and sufficient hardstanding for the placement of 14 x 240L bins (2 per plot using). These details shall be submitted to and agreed in writing by the Local Planning Authority and shall also be installed prior to first occupation of plots 1-6 as shown on the approved plans.","entity-name":"bin storage","entity-prefix":"planning-condition","entity-reference":"U0122142","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]