[{"fact":"9b7d76cca882f7db856a60dfee4651021f07e5f914698150c7fceaa228a45b43","entity":73002793,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the approved flood risk assessment and site plans and the following mitigation measures they detail: - Finished floor levels shall be set no lower than existing - As per the submitted floor plans (Drawing 001, Sept 2023, 23/161) there shall be no ground floor sleeping acommodation These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"Flood risk mitigation measures","entity-prefix":"planning-condition","entity-reference":"U0121845","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]