[{"fact":"27d76483c30f88b49c74478f12461ca334affbff6d79ac540961507e0be11a0f","entity":73002781,"reference-entity":"","field":"description","value":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: - Site Location Plan as Existing (DWG no001); - Site Plan as Proposed (DWG no004 Rev A); - Housetype A - Plans as Proposed (DWG no002 Rev B); - Housetype B - Plans as Proposed (DWG no003 A); - Ibstock Ivanhoe Westminster Brick 65mm Red Multi; - Marley Mendip Tile Old English Dark Red; - Hydro Brake Optimum SHE-0082-2500-0500-2500 (dated 8 February 2024); - 23668 Harlequin Thorne Surface Water Drainage Maintenance and Management Schedule; - File 23688 Harlequin Flow 10C; - Drainage Strategy (DWG no23688-DR-C-0100 P2); - Supplemental Investigation for Soil Contamination dated 4 December 2023 (ref: 23150/SI/01); - Flood Risk and Sequential Test Assessment (dated 17 July 2023); - Flood Evacuation Plan received on 22 April 2024; - Phase 1 Preliminary Geo Environmental Risk Assessment (Report Ref: 23150/P1/0 dated une 2023); - Preliminary Bat Roost Assessment Report (ref: HQ.7.11.2019 dated 25 November 2019).","entity-name":"Approved Documents","entity-prefix":"planning-condition","entity-reference":"U0121824","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]