[{"fact":"e567b29c4885c2ae56953d36322e904ad2a8b5e9c75d8e523890a84e82f436b3","entity":73002705,"reference-entity":"","field":"description","value":"The development hereby approved shall be carried out in accordance with the submitted flood risk assessment (Flood Plan Limited 2024) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 6.32 metres above Ordnance Datum (AOD); - Flood resistance and resilience measures shall be installed as per Section 7.0 of the submitted Flood Risk Assessment. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"Flood details","entity-prefix":"planning-condition","entity-reference":"U0121370","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]