[{"fact":"c3fea72149ca0774a928ec03ef82098f7e5ac69f6f76fcf2520e48a9072a4a9e","entity":73002599,"reference-entity":"","field":"description","value":"The development hereby approved shall be carried out in accordance with the submitted flood risk assessment (ref. EWE Associates Ltd, Revision B, dated 03/10/2023) and the following mitigation measures it details: - Finished floor levels of the converted garage/store shall be set no lower than 5.9 metres above Ordnance Datum (AOD); - Flood resistance and resilience measures shall be installed as per pages 20-22 of the approved Flood Risk Assessment. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"Flood mitigation and resilience","entity-prefix":"planning-condition","entity-reference":"U0120335","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]