[{"fact":"f8bf050a9f1067ae0e05475480d170db7bf1f5e1a19cbad2e270a2f24aa275c3","entity":73002578,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment (ref 23018-FRA-001 Rev C / Dart Engineers Ltd / Rec'd December 2023 ) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 5.67 metres above Ordnance Datum (AOD) o Flood resistance and resilience measures will be included as stated within Section 3 of the submitted FRA These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"FRA","entity-prefix":"planning-condition","entity-reference":"U0120152","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]