[{"fact":"3b334e61dae4b59c8cecfd6e19dc2b0715251e45c65c8d5cb9cbffdef5f3881e","entity":73002571,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment by Met Engineers Ltd, referenced P23-01098 Revision 00, dated November 2023 and the following mitigation measures it details: - Finished floor levels shall be set no lower than existing. - There shall be no increase in building footprint as a result of the change of use. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"FRA Compliance","entity-prefix":"planning-condition","entity-reference":"U0120057","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]