[{"fact":"0b5733b54d75ad265b18f52c98ffb0c0d033965e46834e574edb6e15b2defb1f","entity":73002555,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 30/05/2023 Site Plan: Drawing No. 03-P-XX-01 Revision A as received 13/02/2024 Proposed Floor Plans: Drawing No. 03-P-00_02 Rev C as received 11/03/2024 Proposed Elevations: Drawing No. 03_E_XX_02 Revision A as received 21/07/2023","entity-name":"In accordance with plans specified","entity-prefix":"planning-condition","entity-reference":"U0119883","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]