[{"fact":"fe05c8aac2022453c4b7445fb98c2d15c9b3da2be1b39a1a683bf61d6d3c8a94","entity":73002539,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 31/01/2024 Site Plan: Drawing No. 011 (Revision D) as received 31/01/2024 Proposed Floor Plans: Drawing No. 002 (Revision J) as received 27/09/2023 Proposed Elevations: Drawing No. 003 (Revision D) as received 27/09/2023","entity-name":"In accordance with plans specified","entity-prefix":"planning-condition","entity-reference":"U0119687","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]