[{"fact":"422d637eefe592de2b69bd8de82efec05cd9c7e9d018c251e374720bd1964cb5","entity":73002454,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment produced by Baynham Meikle Partnership Limited dated 13 December 2021, reference 13130-APB-FRA-30.04.21, Revision 1.1, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 10.23 metres above Ordnance Datum (AOD) The mitigation measure shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"flood risk assessment","entity-prefix":"planning-condition","entity-reference":"U0119205","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]