[{"fact":"5a790dbeae53d624595baca4ea3f52d1ebe51255f39e18a8caf13b6f2b598699","entity":73002408,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Floor Plans: Drawing No. 05 (Revision B) as received 27/11/2023 Proposed Elevations: Drawing No. 06 (Revision B) as received 27/11/2023 Location Plan: Drawing No. 01 as received 18/09/2023 Site Plan: Drawing No. 02 as receievd 18/09/2023","entity-name":"In accordance with plans specified","entity-prefix":"planning-condition","entity-reference":"U0118656","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]