[{"fact":"170f3897529e1f3cef8bcf1b88940e30c1099652e816e72e9a73222b55b9e27b","entity":73002393,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment (ref December 2022 - JBA Consulting - Doncaster Waterfront) and the following mitigation measures it details: There shall be no ground level raising as a result of the remediation works These mitigation measures shall be fully implemented prior to the use first commencing and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"EA - FRA","entity-prefix":"planning-condition","entity-reference":"U0118626","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]