[{"fact":"844d31763fa45ba2dc9ebbce0c167a56ca4313dd26c2880e45d2b1350a80a5cd","entity":73002177,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment (ref GER Architectural Design Services / 22-28-004 / Rec'd 28/11/2023) and the following mitigation measures it details: o Finished floor levels for the residential development shall be set no lower than 9.6 metres above Ordnance Datum (AOD) o As per the submitted plans, there shall be no increase in building footprint These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"EA Condition","entity-prefix":"planning-condition","entity-reference":"U0117383","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]