[{"fact":"d65d1f5fb21cdbd72621d50d09a1a789afad94327be8cbc64349f0897a95f589","entity":73002100,"reference-entity":"","field":"description","value":"The development shall be carried out in accordance with the submitted flood risk assessment (ref September 2023 / GridServe / LCO-JBAU-XX-XX-RP-Z-0001) and the following mitigation measures it details: o The concrete foundation which holds the sub-station and charging infrastructure, shall be set no lower than 150mm above the surrounding ground levels o The electrical cabling and substation hardware should be set at a height of 150mm above the surrounding ground level These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.","entity-name":"EA","entity-prefix":"planning-condition","entity-reference":"U0117043","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-06-21","latest-resource":"cddbf6b3b9eea723b5249c68a38910c2e0b5179b9d93e006eb17572584b10bdc","resources":""}]