[{"fact":"2d78b5933f1312d9a53817a04dd0db3afe8ff29fe5151d80326e6955908c0e4e","entity":73000873,"reference-entity":"","field":"description","value":"Surface water run-off from the areas used for the battery storage, areas used for and immediately adjacent to battery storage facilities and/or other similar shall not discharge to any public surface water sewer network. Surface water from such areas must pass through a chemical interceptor/separator of adequate design that has been submitted to and approved by the Local Planning Authority, before discharge to the public sewer network.","entity-name":"Surface Water","entity-prefix":"planning-condition","entity-reference":"U0111385","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-02-25","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]