[{"fact":"c14bea4afe8e9ab305161b0fd77385e09654eee9b1b63aac9ef9f24e76007181","entity":73000820,"reference-entity":"","field":"description","value":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Elevations: Drawing No. 06 as received 09/05/2023 Proposed Floor Plans (ground floor): Drawing No. 05 as received 09/05/2023 Proposed Floor Plans (first floor): Drawing No. 05.2 as received 03/07/2023 Proposed SIte Plan: Drawing No. 02 as received 09/05/2023","entity-name":"In accordance with plans specified","entity-prefix":"planning-condition","entity-reference":"U0111129","earliest-entry-date":"2025-02-25","latest-entry-date":"2025-02-25","latest-resource":"6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c","resources":""}]