[{"fact":"40d3193a7db68ecd3393a09f5d96944c7fcf57191b80f495a3729e33c8892d64","entity":1740509,"reference-entity":"","field":"notes","value":"Site is allocated in the local plan. Planning permission granted (FUL/2020/1142) for the erection of 87 dwellings, and for erection of extension to multi-story car storage (FUL/2020/1143). End date entered as construction is underway. Phase 1 is underway with 18 dwellings completed and 69 remaining to be built. Phase 2 (23 dwellings) needs to be consented.","entity-name":"BLR21","entity-prefix":"brownfield-land","entity-reference":"BLR21","earliest-entry-date":"2023-12-08","latest-entry-date":"2023-12-08","latest-resource":"fed41014d16617d787676b57c7668ac5436c14a259b1a76fe3806a86a29fe092","resources":""}]