{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008799,"name":"Ecological Enhancement Plan","dataset":"planning-condition","typology":"policy","reference":"U0119339","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the ecological interests of the site are maintained in accordance with Local Plan policy 29.","description":"Within one month of the site clearance and remediation works being completed on site, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: i) 20 swift boxes of the Vivara Pro Woodstone type or similar, to be located on suitable dwellings as directed by a suitably qualified ecologist ii) 10 bat boxes of the Vivara Pro Woodstone to be located on suitable dwellings as directed by a suitably qualified ecologist iii) A scheme of native species planting and seeding alongside the off-site drainage ditch to provide a suitable riparian habitat. iv) Suitable access routes for small terrestrial mammals be built into garden boundaries."}