{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008761,"name":"Environmental audit","dataset":"planning-condition","typology":"policy","reference":"U0118868","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To enable the site to be monitored.","description":"Between the 1st and 31st of January in each calendar year following the commencement of the development hereby permitted, the site operators shall supply the Mineral Planning Authority with an environmental audit, which shall provide the following details: o A current survey plan indicating the location of faces, benches and soil and subsoil heaps; o Volumes of soils and subsoil materials on site; o The progress of restoration; o Compliance with conditions; o Non-compliance with conditions."}