{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008675,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0117234","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment by Dart Engineers Ltd, referenced 23202-FRA-001 Rev A, dated April 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.96 metres above Ordnance Datum (mAOD) or 600mm above ground levels, whichever is higher. - Resilience measures shall be implemented as detailed in section 3.1.2 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}