{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008649,"name":"Design and Assoc Management SuDs","dataset":"planning-condition","typology":"policy","reference":"SUDS1","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Standard Condition","reason":"To prevent the increased risk of flooding; to ensure the future maintenance of the SuDS system, to improve water quality, habitat and amenity all in accordance with NPPF.","description":"No development shall take place until a detailed design and associated management and maintenance plan of surface water drainage for the site, based upon sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development has been submitted in accordance with the approved detailed design, prior to the use of the development commencing. The scheme to be submitted shall demonstrate that the surface water drainage system(s) are designed in accordance with the South Yorkshire Interim Local Guidance for SuDS."}