{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003267,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0130786","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is reslient from flood risk in accordance with Policy 57 of the Local Plan.","description":"The development shall be carried out in accordance with the approved Flood Risk Assessment by Roberts Design Ltd (dated October 2023) and the mitigation measure detailed prior to first use. Evidence of these measures should be kept and retained."}