{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003169,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0127717","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure suitable surface water disposal as required by Local Plan Policy 56.","description":"There shall be no piped discharge of surface water from the development. Surface water shall be disposed of via infiltration with excess water draining to the lake after passing through sedimentation removal chambers or reed beds."}