{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003157,"name":"Cabling underground","dataset":"planning-condition","typology":"policy","reference":"U0127526","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect the character of the area.","description":"All cabling (with the exception of that connecting between solar arrays) shall be installed underground."}