{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003110,"name":"Finished floor levels","dataset":"planning-condition","typology":"policy","reference":"U0126936","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants, and to comply with Doncaster Local Plan Policy 57 and NPPF paragraph 167","description":"The development hereby approved shall be carried out in accordance with the submitted flood risk assessment (ref. JOC Consultants Ltd, ref. 23/023.01 Revision 01, dated 8th November 2023) and the finished floor levels it contains at paragraph 8.1.2. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}