{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73003081,"name":"Temp period","dataset":"planning-condition","typology":"policy","reference":"U0125630","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The use hereby approved is not considered suitable as a permanent form of development to safeguard the setting of the Countryside and to comply with policy 25 of the Doncaster Local Plan.","description":"The development hereby permitted shall be for a limited period being the period from the date of this decision until the 31 March 2025. At the end of this period, the use hereby permitted shall cease, all materials and equipment brought on to the land in connection with the use shall be removed, and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority."}