{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002864,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0122202","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin.","description":"Prior to the commencement of above ground works, details of the foul, surface water and land drainage systems and all related works necessary to drain the site shall be submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the first use of the development."}