{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002839,"name":"Remediation Strategy - EA -Precom","dataset":"planning-condition","typology":"policy","reference":"U0122139","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not contribute to, and is not put at unacceptable risk from or adversely affected by, unacceptable levels of water pollution in accordance with Policies 54 & 55 of the Local Plan. Details of the agreed contamination prevention measures are required to be in place prior to development commencing to ensure protection is in place.","description":"No development approved by this planning permission shall commence until a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted, has been submitted to, and approved in writing by, the local planning authority. This strategy will include the following components: 1. A site investigation scheme, based on the preliminary risk assessment to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off-site. 2. The results of the site investigation and the detailed risk assessment referred to in (1) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. 3. A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (2) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action. Any changes to these components require the written consent of the local planning authority. The scheme shall be implemented as approved."}