{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002826,"name":"Drainage (Amended)","dataset":"planning-condition","typology":"policy","reference":"U0122125","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems","description":"The drainage strategy for the drive-thru as approved under ref. 17/01223/COND (Drainage layout 3401-103-B1; Storm Water Attenuation Tank details TUB/15067; Foul Drain Pumping Station 3401-106-B1; Foul Rising Main - Route through carpark 3401-105-B) shall be implemented and retained for the lifetime of the development."}