{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002793,"name":"Flood risk mitigation measures","dataset":"planning-condition","typology":"policy","reference":"U0121845","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants","description":"The development shall be carried out in accordance with the approved flood risk assessment and site plans and the following mitigation measures they detail: - Finished floor levels shall be set no lower than existing - As per the submitted floor plans (Drawing 001, Sept 2023, 23/161) there shall be no ground floor sleeping acommodation These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}