{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002781,"name":"Approved Documents","dataset":"planning-condition","typology":"policy","reference":"U0121824","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: - Site Location Plan as Existing (DWG no001); - Site Plan as Proposed (DWG no004 Rev A); - Housetype A - Plans as Proposed (DWG no002 Rev B); - Housetype B - Plans as Proposed (DWG no003 A); - Ibstock Ivanhoe Westminster Brick 65mm Red Multi; - Marley Mendip Tile Old English Dark Red; - Hydro Brake Optimum SHE-0082-2500-0500-2500 (dated 8 February 2024); - 23668 Harlequin Thorne Surface Water Drainage Maintenance and Management Schedule; - File 23688 Harlequin Flow 10C; - Drainage Strategy (DWG no23688-DR-C-0100 P2); - Supplemental Investigation for Soil Contamination dated 4 December 2023 (ref: 23150/SI/01); - Flood Risk and Sequential Test Assessment (dated 17 July 2023); - Flood Evacuation Plan received on 22 April 2024; - Phase 1 Preliminary Geo Environmental Risk Assessment (Report Ref: 23150/P1/0 dated une 2023); - Preliminary Bat Roost Assessment Report (ref: HQ.7.11.2019 dated 25 November 2019)."}