{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002756,"name":"Drainage Implemented","dataset":"planning-condition","typology":"policy","reference":"U0121625","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site is connected to suitable drainage systems as required by Policies 56 and 57 of the Local Plan.","description":"No part of the development shall be brought into use until the drainage scheme has been completed in accordance with the approved details. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."}