{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002722,"name":"SAP","dataset":"planning-condition","typology":"policy","reference":"U0121427","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To minimise the impact of the development on the effects of climate change as required by Policy 46 B) of the Local Plan. This condition is required to be discharged prior to occupation as the approved detail may have an impact on the design and fabric of the building during construction or the appearance of the development.","description":"The approved teaching block shall be constructed in accordance with the approved Sustainable Statement submitted by BAM. Before the building is occupied or sold, details of the installed measures shall be submitted to and approved by the Local Planning Authority prior to first occupation."}