{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002712,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0121417","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9001 Revision P06 Site Masterplan received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9008 Revision P08 Site landscape plan - West area received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9009 Revision P10 Site landscape plan - North area received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9010 Revision P10 Site landscape plan - South area received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9011 Revision P05 Green Infrastructure Strategy Plan received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9015 Revision P07 Planting Plan received 25.03.24 Dwg. No. SRP1044-DHL-XX-XX-T-L-9020 Revision P04 Landscape / External Works Specification received 25.03.24 Dwg. No. SRP1044-DHL-XX-XX-T-L-9021 Revision P02 13/03/24 - Clause Q35 Litter collection added received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9050 Revision P02 Retaining Wall to access road received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9051 Revision P01 Retaining Wall / Seating Wall to PSBP block received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9053 Revision P03 Landscape canopies with photo voltaic panels received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9054 Revision P01 Hard paving and fencing details received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9055 Revision P01 Soft landscape details received 12.03.24 Dwg. No. SRP1044-BBA-ZZ-00-D-A-2010 Ground Floor - Planning 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-01-D-D-2011 First Floor - Planning 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-02-D-A-2012 Second Floor - Planning 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-RF-D-A-2004 Roof Plan P09 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-3001 GA Elevations - Sheet 1 P07 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-3002 GA Elevations - Sheet 2 P07 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-3003 GA Elevations - Sheet 3 P07 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-4001 GA Sections - Sheet 1 P04 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-4002 GA Sections - Sheet 2 P04 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9001 External Visuals Sheet 1 P03 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9002 External Visuals Sheet 2 P03 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9004 Existing Buildings 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9007 Street Scene & Context Study 02 received 16.02.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9004 P05 Secure Line Strategy received 25.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9007 P02 Site Sections received 25.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9012 P01 Existing and Proposed Levels received 09.11.23 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9100 P01 Site location plan received 13.11.23 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9102 P03 Site location plan and existing site plan received 09.11.23 Dwg. No. SRP1044-BAM-XX-XX-T-X-0002 P01 External Finishes Schedule received 25.03.24"}