{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002688,"name":"flood reslience","dataset":"planning-condition","typology":"policy","reference":"U0121225","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","description":"The development hereby approved shall be carried out in accordance with the submitted flood risk note and the following mitigation measures it details: - Flood resistance and resilience measures shall be installed as per the flood risk note These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}