{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002578,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0120152","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref 23018-FRA-001 Rev C / Dart Engineers Ltd / Rec'd December 2023 ) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 5.67 metres above Ordnance Datum (AOD) o Flood resistance and resilience measures will be included as stated within Section 3 of the submitted FRA These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}