{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002571,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0120057","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants and to prevent flooding elsewhere by ensuring that flood volumes are not displaced.","description":"The development shall be carried out in accordance with the submitted flood risk assessment by Met Engineers Ltd, referenced P23-01098 Revision 00, dated November 2023 and the following mitigation measures it details: - Finished floor levels shall be set no lower than existing. - There shall be no increase in building footprint as a result of the change of use. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}