{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002560,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0120031","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan - Drawing no. 1B - ASHP Site Block Plan - Drawing no. 7A - ASHP/Solar Proposal (Locations) Site Plan - Drawing no. 2A - PV Panels specification - ValkPVplanner Project Report, 15.09.023 - ASHP specification - Daikin heating solution report - Noise Impact Assessment Report P6978-R1-V1, NoiseAir, 12th January 2024 - Proposed Elevations (ASHP - East), Drawing no. 3.1B - Proposed Elevations (ASHP - East 1:20), Drawing no. 4B - Proposed Elevations (ASHP - North), Drawing no. 5.2B - Proposed Elevations (ASHP - North 1:100), Drawing no. 5.1B - Proposed Elevations (PV panels - West), Drawing no. 2A - Proposed Elevations (PV Panels - South), Drawing no. 1A - Proposed Elevation (PV panels - East) , Drawing no. 3.3B"}