{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002435,"name":"Temp period","dataset":"planning-condition","typology":"policy","reference":"U0119051","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"The use of the container hereby approved is not considered suitable as a permanent form of development to safeguard the appearance and use of the open space and to comply with Local Plan Policy 46.","description":"The use and container structure hereby permitted shall be for a limited period being the period of 5 years from the date of this decision. At the end of this period, the use of the container hereby permitted shall cease, and the container, all structures, materials and equipment brought on to the land in connection with the use of the container shall be removed, and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority."}