{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002428,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0119014","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment prepared by Howard J Wroot, referenced 2nd Addendum, dated 29 January 2024, and the following mitigation measures it details: - Finished floor levels of the workshop shall be set no lower than 4.65 metres above Ordnance Datum (AOD). - Flood resilience and resistance measures shall be included as detailed in the submitted FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}