{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002405,"name":"FRA","dataset":"planning-condition","typology":"policy","reference":"U0118638","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment prepared by LK Consult Ltd (reference FRA 23 1103 - FRA - R0, dated August 2023, and the substation drawing (Substation, Proposed Plan; Uploaded 19/12/2023) and the following mitigation measures they detail: Finished floor levels shall be set no lower than existing at 4.0 metres Above Ordnance Datum Substation finished floor level shall be set no lower than 4.4 metres Above Ordnance Datum"}